Market closed·Syncing…
SMEMarket closed · Close · 19 Nov

Konstelec Engineers Limited KONSTELECshare price and chart

Konstelec Engineers closed at ₹36.10 on 19 November 2026, down 4.87% on the day. The 52-week range is ₹28.00 to ₹71.10.

₹36.10The price one share last traded at, in rupees.▼ 4.87% · ₹1.85
52-wk low ₹2819% up the rangeThe highest and lowest price the share has traded at in the past year, and where today's price sits between the two.high ₹71

Daily candlesEach candle is one trading day. The chart opens on the last year; drag back past the start or open full screen and the rest loads, back to listing (or the first day in our data). The body runs from the open to the close, the thin lines to the high and low. Green closed up, red closed down.

Loading prices…

Split and bonus adjusted daily candles. Drag back past the start, or open full screen, and its whole history loads. Scroll or pinch to zoom; full screen adds indicators, drawing and measuring.

Test a strategy on KONSTELEC

Real prices, every charge counted. Pick one or write your own.
What Konstelec Engineers Limited does
A short, human-reviewed summary of the business, written from public sources. Background, not analysis, and not updated intraday.
business summary

Konstelec Engineers, established in 1995, is an engineering and EPC provider for electrical, instrumentation, automation and operations and maintenance work, covering engineering, procurement, construction, installation, testing, commissioning and maintenance for industrial and infrastructure projects.

1
1Sector

Construction

2
2What it sells

Electrical, instrumentation and automation EPC, O&M

Technical snapshotHow the share has been behaving: its momentum, its trend, how much of the trading was real buying to keep, and its returns.

EOD 19 Nov
RSI (14) · 30 oversold, 70 overboughtA score from 0 to 100 showing how strong recent up days were against recent down days.
27Oversold
0 oversold3070overbought 100
Delivery · bought to hold vs churnOf all the shares traded in a day, the share that actually changed hands and went into someone's demat account, rather than being bought and sold the same day.
100%Near average
today 100%20d avg 86.5%

The share of traded quantity that was actually delivered (not squared off intraday) - high delivery vs its 20-session average suggests real buying or holding, not just churn.

vs 50 DMAHow far today's close is above or below the average closing price of the last 50 trading days. It shows the medium-term trend.▼ 28.0%vs 200 DMAHow far today's close is above or below the average closing price of the last 200 trading days, about ten months. It is the most watched line for the long-term trend.▼ 24.1%1 monthHow much the share price has changed over the period.▼ 24.8%3 monthsHow much the share price has changed over the period.▼ 41.1%1 yearHow much the share price has changed over the period.▼ 49.4%Vol 30dHow much the share has actually been moving day to day, stated as a yearly percentage. 30% means it swung roughly 30% a year at that pace.49.3%

Returns and valuationWhat the market pays for this company and how well the business uses its money.

Books to 30 Sept 2026
Market capWhat the whole company is worth on the stock market: share price times the number of shares. It measures size, not quality.₹55 Cr19 NovP/EHow many rupees investors pay today for one rupee of the company's yearly profit. A P/E of 20 means paying ₹20 for ₹1 of annual profit.8.9xlast 4 quarters, to Sept 2026Price to bookThe share price against the shareholders' money per share on the balance sheet. It asks what you pay for each rupee the owners have in the business.0.51xbooks of Sept 2026Return on capitalHow much operating profit the company made on all the money in the business, whether it came from owners or lenders.11.0%full year FY26Dividend yieldThe cash paid out in a year as a percentage of today's share price. A 2% yield means ₹2 a year on a ₹100 share.0.00%last 12 monthsDebt to equityBorrowings compared with the shareholders' money. 1 means the company owes as much as its owners have put in; 0 means no borrowings.1.02xbooks of Sept 2026FCF marginOf every ₹100 of sales, how much cash was left after running the business and paying for new assets.-6.7%year to Mar 2026

Against its sectorWhere this company ranks among similar companies on each measure.

Civil Construction · 119 peers · medians
P/EHow many rupees investors pay today for one rupee of the company's yearly profit. A P/E of 20 means paying ₹20 for ₹1 of annual profit.8.94vs 12.8 median
Cheapest: SONUINFRA 2.81Priciest: IL&FSENGG 107
Net marginOf every ₹100 of sales, how much is left as profit after all costs, interest and tax.3.33%vs 6.46% median
Lowest: MADHUCON -60.24%Highest: ATMASTCO 30.56%
Revenue growthHow much sales grew in the latest quarter against the same quarter a year earlier.-26.27%vs 15.84% median
Lowest: WSI -99.88%Highest: UNIVASTU 210.15%

What the numbers sayShort plain statements about this company's latest figures.

Written by fixed rules
Worth watching
  • Promoter holding fell 3.6 points over 11 quarters (66.77% to 63.18%).

Each line is written by a fixed rule from the company's own filings and share price, and names the figures it uses. It describes what happened; it is not advice about the share.

What it has returnedThe yearly growth rate in the share price over each period, as if it had grown smoothly.

Price only, before dividends
-35.8%over the last year
1 yr
-35.8%

Shareholding patternThe share of the company held by its promoters, by foreign and domestic institutions, and by the public, quarter by quarter.

Who owns it
63.18%promoter holding, as of 2026-09-30-3.6 pts since 2024
Promoter share since listing
2024-0163.18% now, drawn to its own range2026-09

The promoter/promoter-group stake as a percentage of total shares, each quarter since listing. A rising line means promoters are adding to their stake; a falling one often means dilution, pledge-driven sales, or stake sales to new investors.

Recent announcementsThe company's own filings to the exchange in the last six months: results, board meetings, investor calls and more, each with its source document.

Last 6 months
Outcome of Board Meeting18-Nov-2026

Konstelec Engineers Limited has submitted to the Exchange, the financial results for the period ended September 30, 2026, Board Meeting held on November 18, 2026

General Updates11-Nov-2026

Konstelec Engineers Limited has informed the Exchange about INTIMATION REGARDING DELAY IN DECLARATION OF UNAUDITED FINANCIAL RESULTS FOR THE QUARTER AND HALF-YEAR ENDED SEPTEMBER 30, 2026.

General Updates22-Oct-2026

Konstelec Engineers Limited has informed the Exchange about disclosure under Regulation 30 SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 pertaining to approval of Strike-Off of an Joint Venture Company.

Certificate under SEBI (Depositories and Participants) Regulations, 201822-Oct-2026

Konstelec Engineers Limited has informed the Exchange about Reconciliation of Share Capital Audit Report under SEBI (Depositories and Participants) Regulations, 2018 for the quarter ended on September 30th, 2026

Quarterly Compliance Report on Corporate governance - within 21 days from the end of the quarter16-Oct-2026

Konstelec Engineers Limited has informed regarding Non-Applicability of the Corporate Governance Provisions under regulation 15(2) of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, for the Quarter and half year end 30th September 2026.

Certificate under SEBI (Depositories and Participants) Regulations, 201816-Oct-2026

Konstelec Engineers Limited the Exchange about Certificate under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018.

Trading Window29-Sep-2026

Konstelec Engineers Limited has informed the Exchange regarding the Trading Window closure pursuant to SEBI (Prohibition of Insider Trading) Regulations, 2015

Shareholders meeting25-Sep-2026

Konstelec Engineers Limited has submitted the Exchange a copy Srutinizers report of Annual General Meeting held on September 23, 2026. Further, the company has informed the Exchange regarding voting results.

Shareholders meeting23-Sep-2026

Konstelec Engineers Limited has informed the Exchange regarding Proceedings of Annual General Meeting held on September 23, 2026

Bagging/Receiving of orders/contracts04-Sep-2026

Konstelec Engineers Limited has informed the Exchange about Bagging/Receiving of orders/contracts Receipt of Letter of Acceptance amounting to ₹58.48 Crore Excluding GST from Numaligarh Refinery Limited, for undertaking Instrumentation Works for EPCM-2 Services for RPTU Unit for Numaligarh Refinery Expansion Project (NREP), Numaligarh, Assam (Group A).

Bagging/Receiving of orders/contracts02-Sep-2026

Konstelec Engineers Limited has informed the Exchange about Bagging/Receiving of orders/contracts by Reliance Industries Limited for execution of Electrical & Instrumentation works at Jamnagar, Gujarat. Pursuant to the aforesaid amendment, the Total Contract Order Price has been revised from 4.12 /- Crores to 9.19 /- Crores.

Shareholders meeting29-Aug-2026

Konstelec Engineers Limited has informed the Exchange regarding Notice of Annual General Meeting to be held on September 23, 2026 at 04: 00 P.M (IST)

Press Release22-Aug-2026

Konstelec Engineers Limited has informed the Exchange regarding a press release dated August 22, 2026, titled "Submission of Press Release Konstelec Engineers Secures 48.87 Crore Excluding GST Data Centre Infrastructure Contract from CtrlS Data centers Limited".

Bagging/Receiving of orders/contracts22-Aug-2026

Konstelec Engineers Limited has informed the Exchange about Receipt of Letter of Award worth 48.87 Crore Excluding GST from CtrlS Data centers Limited.

Outcome of Board Meeting21-Aug-2026

Konstelec Engineers Limited has informed the Exchange regarding Outcome of Board Meeting held on August 21, 2026.

Backtest idea · KONSTELECMACD momentum

Momentum turning up, only while the long trend is up.

BuyMACD crosses above signal, price above 200-day SMA
SellMACD crosses back below
Real prices · every charge countedRun on KONSTELEC
Backtest idea · KONSTELECLower band bounce

Buys a stretch below the usual range, sells on the way back.

BuyCloses below the lower Bollinger band
SellBack at the middle band, or 15 days
Real prices · every charge countedRun on KONSTELEC
Backtest idea · KONSTELECSupertrend rider

Stays in while the trend line says up, out when it flips.

BuySupertrend turns up
SellSupertrend turns down
Real prices · every charge countedRun on KONSTELEC
Your own ideaWrite a rule for KONSTELEC in plain English“Buy KONSTELEC when …”
Start writing
Buy the dip on KONSTELECBuy when RSI(14) drops below 30
52-week high breakout on KONSTELECBuy when closes at a 52-week high
Golden cross on KONSTELECBuy when 50-day EMA crosses above 200-day
Stochastic oversold on KONSTELECBuy when stochastic %K drops below 20
Pullback in an uptrend on KONSTELECBuy when RSI(14) below 40, price above 200-day EMA

Key ratios at a glanceThe eight figures most people check first, each placed against companies in the same industry.

Against its sector
Market capWhat the whole company is worth on the stock market: share price times the number of shares. It measures size, not quality.
₹55 cr
Larger than 13% of 119 peers
sector middle ₹491 cr
P/EHow many rupees investors pay today for one rupee of the company's yearly profit. A P/E of 20 means paying ₹20 for ₹1 of annual profit.
8.9x
Lower than 73% of 88 peers
sector middle 12.8x
Price to bookThe share price against the shareholders' money per share on the balance sheet. It asks what you pay for each rupee the owners have in the business.
0.5x
Lower than 87% of 107 peers
sector middle 1.5x
ROCEHow much operating profit the company made on all the money in the business, whether it came from owners or lenders.
11.0%
Lower than 64% of 105 peers
sector middle 14.1%
FY25 8.3%FY26 11.0%
Debt to equityBorrowings compared with the shareholders' money. 1 means the company owes as much as its owners have put in; 0 means no borrowings.
1.02
Higher than 86% of 107 peers
sector middle 0.47
FY25 0.70FY26 0.85
Dividend yieldThe cash paid out in a year as a percentage of today's share price. A 2% yield means ₹2 a year on a ₹100 share.
0.0%
Lower than 35% of 119 peers
sector middle 0.0%
Sales growthHow much sales grew in the latest quarter against the same quarter a year earlier.
-26.3%
Lower than 91% of 93 peers
sector middle +15.8%

Peers are the listed companies in the exchange's own industry group: Civil Construction. Balance-sheet figures are from the latest filed balance sheet; trends show each financial year we hold.

Cash flowProfit is an accounting figure. Cash flow shows the money that really moved: in from the business, out on investments, and to or from lenders and shareholders.

Where the cash went

In FY26 cash fell by ₹1 Cr, after ₹4 Cr spent on plant and equipment.

FY26Cash in or out
Running the business-₹10 Cr
Investing-₹4 Cr
Lenders and shareholders+₹13 Cr
Net change in cash-₹1 Cr

Health check, year by yearMargins, returns and debt for each financial year, so you can see the direction.

MeasureFY25FY26
ROCEHow much operating profit the company made on all the money in the business, whether it came from owners or lenders.8.3%11.0%
Debt to equityBorrowings compared with the shareholders' money. 1 means the company owes as much as its owners have put in; 0 means no borrowings.0.70x0.85x

Each row against this company's own usual level: green better, red worse, grey close to it.

Backtest idea · KONSTELECStochastic oversold

Buys when the close sits near the bottom of its recent range.

BuyStochastic %K drops below 20
Sell8% profit, or after 15 days
Real prices · every charge countedRun on KONSTELEC
Backtest idea · KONSTELECPullback in an uptrend

Buys a pause inside a rising trend.

BuyRSI(14) below 40, price above 200-day EMA
Sell8% profit, or after 30 days
Real prices · every charge countedRun on KONSTELEC
Backtest idea · KONSTELECBuy the dip

Buys after a sharp fall, betting on a bounce.

BuyRSI(14) drops below 30
Sell10% profit, or after 20 days
Real prices · every charge countedRun on KONSTELEC
Backtest idea · KONSTELEC52-week high breakout

Buys strength, when the price makes a new one-year high.

BuyCloses at a 52-week high
Sell8% stop loss
Real prices · every charge countedRun on KONSTELEC
Backtest idea · KONSTELECGolden cross

Follows the long trend: in when the fast average crosses above the slow one.

Buy50-day EMA crosses above 200-day
SellWhen it crosses back below
Real prices · every charge countedRun on KONSTELEC
MACD momentum on KONSTELECBuy when MACD crosses above signal, price above 200-day SMA
Lower band bounce on KONSTELECBuy when closes below the lower Bollinger band
Supertrend rider on KONSTELECBuy when supertrend turns up
Buy the dip on KONSTELECBuy when RSI(14) drops below 30
52-week high breakout on KONSTELECBuy when closes at a 52-week high

Peers side by sideCompanies in the same exchange-defined industry group, largest first. Tap a heading to sort.

Civil Construction
CompanyWhat the whole company is worth on the stock market: share price times the number of shares. It measures size, not quality.How many rupees investors pay today for one rupee of the company's yearly profit. A P/E of 20 means paying ₹20 for ₹1 of annual profit.The share price against the shareholders' money per share on the balance sheet. It asks what you pay for each rupee the owners have in the business.How much profit the company made on the shareholders' money in the business. 15% means ₹15 of profit a year on every ₹100 of owners' money.How much operating profit the company made on all the money in the business, whether it came from owners or lenders.Borrowings compared with the shareholders' money. 1 means the company owes as much as its owners have put in; 0 means no borrowings.Of every ₹100 of sales, how much is left as profit after all costs, interest and tax.How much sales grew in the latest quarter against the same quarter a year earlier.The cash paid out in a year as a percentage of today's share price. A 2% yield means ₹2 a year on a ₹100 share.
LT
Larsen & Toubro Limited
5.79 L cr32.4x5.1x14.8%11.5%1.026.9%+15.8%0.90%
RVNL
Rail Vikas Nigam Limited
40,658 cr44.2x4.0x9.0%10.2%0.434.5%-8.2%0.88%
CEMPRO
Cemindia Projects Limited
25,423 cr37.9x9.7x28.2%34.2%0.345.8%+26.4%0.22%
KPIL
Kalpataru Projects International Limited
22,557 cr19.0x2.7x14.5%17.3%0.314.3%+7.3%0.83%
NBCC
NBCC (India) Limited
21,465 cr27.1x6.7x25.2%33.7%0.006.2%+16.7%1.23%
IRB
IRB Infrastructure Developers Limited
21,173 cr19.5x1.0x4.2%7.4%0.9413.7%+8.3%1.08%
ENGINERSIN
Engineers India Limited
17,283 cr19.3x5.2x23.8%29.2%0.0023.7%-10.5%2.11%
TECHNOE
Techno Electric & Engineering Company Limited
10,850 cr22.4x2.5x12.0%14.8%0.0113.4%+31.4%0.75%
IRCON
Ircon International Limited
10,270 cr21.0x1.5x9.1%9.0%0.865.1%+14.9%1.74%
WELENT
Welspun Enterprises Limited
9,315 cr18.0x2.8x13.2%15.8%0.5814.4%+32.0%0.45%
RITES
RITES Limited
9,082 cr22.4x3.4x16.4%21.6%0.0018.2%+1.5%4.21%
NCC
NCC Limited
8,456 cr11.6x1.0x9.3%16.4%0.503.4%+32.4%1.63%
KEC
KEC International Limited
8,163 cr19.3x1.3x10.5%14.1%0.991.9%-10.2%1.79%
AFCONS
Afcons Infrastructure Limited
7,953 cr100.1x1.5x4.7%12.9%0.870.7%-11.8%0.92%
GRINFRA
G R Infraprojects Limited
7,450 cr6.7x0.7x10.1%12.8%0.5911.3%+45.1%0.32%
POWERMECH
Power Mech Projects Limited
7,426 cr18.6x2.8x17.3%22.0%0.436.4%+30.0%0.06%
ISGEC
Isgec Heavy Engineering Limited
7,334 cr35.2x2.6x5.4%10.5%0.253.3%+9.4%0.60%
CEIGALL
Ceigall India Limited
6,654 cr18.6x2.9x15.5%17.3%0.758.2%+26.8%0.13%
DBL
Dilip Buildcon Limited
6,273 cr5.5x0.9x22.9%19.2%1.3512.6%+16.9%0.26%
HCC
Hindustan Construction Company Limited
4,411 cr28.5x2.0x10.9%24.0%0.443.7%-6.7%0.00%
SWSOLAR
Sterling and Wilson Renewable Energy Limited
3,660 cr17.5x5.1x-36.0%-6.3%1.283.0%-12.6%0.00%
AHLUCONT
Ahluwalia Contracts (India) Limited
3,654 cr12.4x1.7x13.8%21.1%0.004.1%+24.3%0.13%
LCCPROJECT
LCC Projects Limited
3,595 cr-2.8x--0.69--0.00%
JKIL
J.Kumar Infraprojects Limited
3,373 cr8.4x0.9x12.1%18.1%0.236.8%+14.7%0.90%
PNCINFRA
PNC Infratech Limited
3,366 cr5.3x0.5x13.0%12.1%0.8210.8%+17.3%0.46%
ASHOKA
Ashoka Buildcon Limited
3,179 cr-0.5x48.0%50.3%0.24--18.7%0.00%
PSPPROJECT
PSP Projects Limited
3,018 cr34.5x2.3x4.5%7.8%0.202.3%+58.4%0.00%
VINDHYATEL
Vindhya Telelinks Limited
2,998 cr11.6x0.6x5.3%4.0%0.327.8%-12.4%0.24%
KNRCON
KNR Constructions Limited
2,899 cr7.4x0.6x9.2%10.4%0.2314.9%-7.2%0.24%
INTERARCH
Interarch Building Solutions Limited
2,691 cr20.2x2.9x16.5%22.5%0.016.7%+2.9%0.78%
RAMKY
Ramky Infrastructure Limited
2,648 cr10.5x1.2x13.4%15.9%0.5713.1%+28.2%0.26%
HGINFRA
H.G. Infra Engineering Limited
2,608 cr12.2x0.8x10.6%12.1%1.484.3%+7.6%0.50%
PATELENG
Patel Engineering Limited
2,404 cr7.9x0.5x6.5%10.6%0.285.8%+0.2%0.00%
SIMPLEXINF
Simplex Infrastructures Limited
2,390 cr39.4x2.4x5.4%2.3%1.495.2%+45.5%0.00%
BGRENERGY
BGR Energy Systems Limited
2,118 cr--56.9%-27.0%---80.5%0.00%
GKENERGY
GK Energy Limited
1,965 cr8.3x2.0x23.0%28.8%0.3512.1%+1.1%0.52%
MBEL
M & B Engineering Limited
1,671 cr16.2x2.4x14.1%19.1%0.157.5%+25.4%0.34%
INDIANHUME
Indian Hume Pipe Company Limited
1,592 cr12.2x1.1x9.9%12.6%0.3110.7%-21.4%1.66%
GPTINFRA
GPT Infraprojects Limited
1,474 cr15.5x2.3x17.5%21.3%0.517.1%+4.6%2.36%
KONSTELEC
Konstelec Engineers Limited
55 cr8.9x0.5x-11.0%1.023.3%-26.3%0.00%

Swipe the table sideways for more columns. Tap a heading to sort. A dash means the figure is not filed or cannot be worked out for that company. A bigger cohort is cut to its 40 largest companies.

Monthly price changeThe share's price change in every calendar month, one row per year, so you can check for yourself whether a month has a pattern.

Month by month
YearJanFebMarAprMayJunJulAugSepOctNovDecYear
2026
-10.1
-15.1
-24.9
+47.1
+12.7
-7.2
+39.3
+4.2
-11.9
-22.4
-17.6
·
-27.8%
11m
2025
-16.9
-26.0
-21.9
+43.0
-23.1
-0.1
-7.3
-3.2
+11.0
-2.4
-18.5
-5.7
-60.6%
2024
·
+3.1
-23.8
+6.0
-1.0
+5.0
-1.5
-0.8
-4.9
-1.7
-34.2
+10.7
-42.3%
11m
Monthly movebelow -10%-10 to -5-5 to -2-2 to 00 to +2+2 to +5+5 to +10above +10%month in progress

Month-on-month change in closing price, adjusted for splits and bonuses but not for dividends, so a large dividend shows up here as a fall. Starts from 1995, when the exchange began trading equities, or from the stock's listing if later. This is a record of what happened, not a forecast.

Deals and filingsLarge trades reported to the exchange, plus the company's documents sorted by type.

DatePartySideQuantityPriceValue
2026-07-31BIHARILAL RAVILAL SHAH · bulkSELL80,000₹61.33₹0.49 Cr
2026-07-30BIHARILAL RAVILAL SHAH · bulkSELL80,000₹60.61₹0.48 Cr
2024-05-09YUGA STOCKS AND COMMODITIES PRIVATE LIMITED . · bulkSELL1,02,000₹304.10₹3.10 Cr
2024-05-09YUGA STOCKS AND COMMODITIES PRIVATE LIMITED . · bulkBUY85,000₹303.62₹2.58 Cr
2024-02-08MANSI SHARE AND STOCK ADVISORS PVT LTD · bulkSELL1,90,000₹270.93₹5.15 Cr
2024-02-08MANSI SHARE AND STOCK ADVISORS PVT LTD · bulkBUY24,000₹267.44₹0.64 Cr
2024-01-31MANSI SHARE AND STOCK ADVISORS PVT LTD · bulkBUY1,32,000₹209.50₹2.77 Cr
2024-01-31MANSI SHARE AND STOCK ADVISORS PVT LTD · bulkSELL1,12,000₹224.59₹2.52 Cr

Read enough? Test KONSTELEC. “Buy KONSTELEC when RSI(14) drops below 30, sell at 10% profit or after 20 days.” Real prices, every charge counted.

Run it free